Emery wear floor hardener is introduced

2016-02-19

A emery wear floor hardener performance characteristics:

Diamond sand abrasion resistant floor hardener, also known as concrete seal curing agent, penetrating type seal hardening agent, is a colorless, transparent, construction is convenient, non-toxic, non flammable, penetration, permanently sealed mixed soil liquid additives, curing agent penetrated by the internal concrete, and chemicals occur chemical reaction, the formation of a gel, shrink pores and cracks of concrete, the concrete into a compact whole, thus greatly improve the surface hardness of concrete, impermeability, abrasion resistance and freeze thaw cycle performance.

Two, emery wear floor hardener product advantages:

1, can effectively improve the concrete surface hardness, strength, density, compressive strength and wear resistance;

2, tightening the pores of concrete, can effectively restrain the outside pollutants into the concrete;

3, completely solve the concrete floor dust, improve the ability of concrete ground water resistance and anti chemical corrosion;

4, the ground will be polished marble like luster, use the longer the better surface finish, look more bright and beautiful.

Three, emery wear floor hardener scope:

Emery wear-resisting ground hardening agent using range widely used in all kinds of wear-resisting requirements and anti permeability surface area required, machine shop, printing shop, underground garage, cement road surface, the new construction of the protoplasmic pressure light concrete ground, carborundum wearable Floor, terrazzo floor and places.

Four, the emery wear-resisting ground hardening agent construction mode: manual operation and machine operation.

The manual operation mode of two layer construction: construction workers wearing rubber gloves, wear clean boots. According to the actual situation of the construction of a ground layer and a layer of A curing agent curing agent B.

The first layer construction: new ground can with water or detergent (open by flying dust or dirt blocking the pores), water swept dry, dry spraying curing agent a on the construction on the ground with a mop drag uniform. In about 2 hours with a curing agent keep wet surface and uniform (not the medicament is gathered in the low-lying place, in order to avoid the surface hardness inconsistent), and then water wet surface is maintained for about 30 minutes to 1 hour after removing agent and water swept dry, dry (6-8 hours).

The second tier construction: spraying curing agent B on the ground and with a mop drag uniform, about 2 hours with a curing agent B keep wet surface and uniform (not the potions gathered in low-lying, lest the surface hardness inconsistent), water wet surface is maintained for about 30 minutes to 1 hour after water wash clean agent (be sure to clean, to avoid ground white). After 1-3 days to reach the ground in 90 days to reach the highest surface hardness, hardness, reduce the ground ash.

The operation of the machine: the construction mode of two layers: (according to the actual situation of the construction of ground 1 times over A and sealing seal curing agent curing agent B)

Inconsistent (,,,, 300# remove the first layer construction: new ground can use ground of professional washing machine has been carbonized cement surface layer (open flying dust or dirt clogging the pores) or from above the grinding, old ground can choose 50# 100# 300# 500# adjustment refurbished the ground, water, dry, dry after spraying seal curing agent a in the construction ground mop absorbed, about 2 hours (depending on the depth of penetration and formation density and treatment agent to keep the surface wetting and uniform (not the potions gathered in low lying, and make the surface hardness, and water to keep the surface moist about 30 minutes to 1 hour after removal agent, water dry, dry (6-8 hours).

The second tier construction: spray seal curing agent B to the construction on the ground and with a mop drag uniform, about 2 hours (depending on the required depth of penetration and formation density and) agents keep wet surface and uniform (not the potions of aggregation in the low lying, and the hardness of the ground inconsistent), and water wet surface for about 30 minutes to 1 hour after water removal agent (be sure to clean, in order to avoid surface pale), 8-24 hours after, using chip mill 800#, 1000#, 2000#.3000#, grinding processing, sucking up water, and dry through processing after the ground in a marble like luster.

After treatment for 1-3 days to reach the ground surface hardness, Tianda -120 90 days to reach the highest hardness

Five, emery wear floor hardener note:

1, the old ground should be removed from the surface coating (such as wax layer, curing agent, resin coating and oil etc.). Heavy oil on the ground, after appropriate treatment only after the construction of high permeability seal curing agent;

2, safety tips: be careful using this product, construction please bring rubber gloves and rubber overshoes. Goggles. Swallow is harmful or fatal, if contact immediately rinse with plenty of water, mistakenly swallowed immediately drink plenty of water and vomiting and taken to hospital for emergency treatment.

Six, carborundum wearable floor hardener packaging: 30 kg / barrel, 250 kg / barrel (big plastic barrel, an inner bag is sealed).

Seven, emery wear floor hardener storage: at 10-25 Deg. C, light shading, airtight storage can be more than 6 months.